Our Services

Solar Panel Cleaning

We guide our clients through complex challenges by providing expert insight, sound judgment, and practical solutions. Our innovative approach helps us deliver effective strategies for even the most difficult domestic and multi-jurisdictional matters. By understanding client needs and thinking ahead, we build long-term relationships based on trust, results, and consistent value.

Over the last 15 Years we made an impact, we have long way to go.

These core principles define our distinctive culture and set us apart. They reflect the unique spirit of our firm and guide the behaviors that enable us to consistently deliver on our commitments to our clients and our people.

Service Process

At Al Naseer Energy Solution, we are driven by three core values:

  • Integrity – Honest advice and transparent solar solutions
  • Quality – Reliable systems built to perform long term.
  • Customer Focus – Solutions designed around customer needs.
What papers needed for solar installation?

Copy of CNIC of the system owner

Latest electricity bill

Property ownership or tenancy documents

Site location and roof layout details

Solar system capacity details

Solar panel and inverter specifications

Net metering application form (if applicable)

Required approvals from the electricity distribution company

How do you evaluate the cost of solar repair?

The cost of solar repair is evaluated through a detailed inspection of the solar system to identify faults in solar panels, inverters, wiring, or mounting structures. Repair costs depend on system size, type of issue, replacement parts, labor charges, and warranty status.

Factors such as system age, performance loss, and accessibility also impact the total solar repair cost. Proper evaluation ensures accurate pricing and long-term system efficiency.

What is the per square-feet cost of panel installation?

The per square-feet cost of solar panel installation depends on panel efficiency, system size, and installation type. On average, one kilowatt (1kW) of solar panels requires around 100 to 120 square feet of roof space.

In Pakistan, the installation cost is usually calculated per kilowatt rather than per square foot. However, when converted, the approximate cost ranges between PKR 1,200 to PKR 2,000 per square foot, depending on equipment quality, inverter type, and installation complexity.

Factors such as roof structure, wiring distance, and mounting system can also affect the final cost.

When should we check the battery connections?

Battery connections should be checked every 3 to 6 months to ensure proper performance and safety of the solar system. Regular checks help identify loose terminals, corrosion, or cable damage that can reduce battery efficiency or cause power issues.

Battery connections should also be inspected after power outages, extreme weather conditions, or if you notice reduced backup time or charging problems. Timely inspection helps extend battery life and ensures reliable energy storage.

Service Options
1

Application submission

Submit your solar system application with complete and accurate documents to ensure a smooth approval process. Once the required information is provided, the application is reviewed and forwarded to the relevant authorities for verification.
2

Inspection

After application approval, a site inspection is carried out to verify technical details and system compliance. The inspection ensures the solar installation meets safety standards, approved designs, and regulatory requirements. This step helps identify any issues early, ensuring a smooth installation and grid connection process.
3

Panel Installation

After successful inspection, solar panels and system components are installed according to approved designs and safety standards. Proper mounting, wiring, and alignment are ensured to maximize system performance and efficiency. Our installation process focuses on quality workmanship, durability, and long-term reliability to deliver optimal solar energy output.
4

Documentation List

CNIC copy of system owner Latest electricity bill copy Site location and roof layout details Solar system capacity details Inverter and solar panel specifications Net metering application form Ownership or tenancy documents Required approvals from authorities (if applicable)
5

Grid connection

After panel installation, the solar system is connected to the utility grid following regulatory approval. This step allows excess electricity to be exported to the grid through net metering. Once connected, the system becomes fully operational, enabling efficient energy use, reduced electricity bills, and long-term savings.
Cart (0 items)
📲 Install App